Construction on Loop 286 in Paris

Traffic around Loop 286 in Paris will be moving a little slower over the next couple of months.

A roadway construction project has limited several sections of the loop to one lane traffic. Road work began on March 18th to repair sections of concrete slabs that have cracked due to the heavy traffic.

"Sometimes the pavement fails, cracks and becomes rough then we have to replace it. Usually the summers are really brutal on this type of pavement." said

While Loop 286 is a two lane road, TXDOT will have to close a lane in construction areas, so be extremely cautious of flaggers. The cost of the project is 176-thousand dollars and is expected to be completed by the end of May.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
Sherman 4201 Texoma Pkwy (903) 892 -8123 Ardmore 2624 S. Commerce (580) 223-0946
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 200148021