Loy Lake Bridge construction to cause closures on U.S. Hwy 75

By: News 12 Staff
By: News 12 Staff

SHERMAN, TX -- Construction on the Loy Lake Bridge is expected to close portions of U.S. Highway 75 in the Sherman-Denison area next week.

Weather permitting, TXDOT will install a bridge beam across southbound traffic beginning Thursday night.

As early as 4 p.m. drivers traveling south on 75 will be diverted onto the frontage road before reaching the bridge.

Lanes are set to reopen around 6 o'clock the following morning.

TXDOT says the bridge should reopen in 8 to 10 weeks, while the entire project is expected to end within 10 months.

The project will widen the bridge from two to four through lanes and also add left-turn lanes in each direction to improve safety and relieve congestion.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
Sherman 4201 Texoma Pkwy (903) 892 -8123 Ardmore 2624 S. Commerce (580) 223-0946
Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 266819391 - http://kxii.com/a?a=266819391
Gray Television, Inc.