Oil pipeline expected to be done by mid-2014

By: From Wire Reports
By: From Wire Reports

FLANAGAN, Ill. (AP) - A 600-mile pipeline extending from Illinois to Oklahoma could be ready by this summer.

That's according to a report by WNIJ Radio.

The pipeline belonging to Enbridge Inc. of Calgary, Alberta will carry tar sands from Flanagan, Ill. near Pontiac to Enbridge's terminal in Cushing, Okla. It also travels through Missouri and Kansas.

From Oklahoma, the oil could be moved through existing lines to Gulf Coast refineries. The Flanagan South pipeline runs parallel to another Enbridge route that's already in place.

Construction began in August 2013.

A spokeswoman for Enbridge says work is Illinois is mostly complete. But this winter's bitter temperatures slowed down work putting topsoil back over the pipeline in some areas.

Still the project is set to be done in mid-2014.

(Copyright 2014 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)


Sherman 4201 Texoma Pkwy (903) 892 -8123 Ardmore 2624 S. Commerce (580) 223-0946
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 251269961 - http://kxii.com/a?a=251269961