Construction set to begin on South Church St. in Paris

By: News 12 Team
By: News 12 Team

PARIS, TX-- Drivers traveling on South Church Street in Paris will have to find a new route, starting Friday.

TxDOT says, Friday morning contractors will begin replacing the existing roadway surface, where South Church Street passes the Kiamichi Railroad Depot, with a new concrete surface.

The work should be finished by August 18th.

A detour will be set up on 1st St. Southwest.


Sherman 4201 Texoma Pkwy (903) 892 -8123 Ardmore 2624 S. Commerce (580) 223-0946
Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 270423891 - http://kxii.com/a?a=270423891
Gray Television, Inc.